That it is the responsibility of any entities wishing to use the personal data on planning applications and decisions lists for direct marketing purposes to be satisfied that they may do so legitimately under the requirements of the Data Protection Acts 1988 & 2003 taking account of the preferences outlined by applicants in their applications.

Microsoft SQL Server Web Assistant

Query Results


Last updated: 2014-11-22 00:00:03.043

Ref_NoReceivedDecision_DueApplicantsDevelopment_AddressTypeDescription
14597Nov 19 2014Jan 22 2015THOMAS SWEENEYTULLY RAHEENS CASTLEBARRRETENTION OF NEWLY CONSTRUCTED EXTENSION TO EXISTING COMMERCIAL SHEDS FOR SOLID FUEL. RETENTION OF EXTENSION TO EXISTING COMMECIAL SHOP. RETENTION OF NEWLY CONSTRUCTED LEAN TO SHED FOR THE STORAGE OF SOLID FUEL AND ALL ASSOCIATED SITE WORKS. RETENTION OF NEWLY CONSTRUCTED CANOPY FOR TIMBER STORAGE. P07/850 & P01/1497 REFERS.
083030Nov 19 2014Jan 22 2015NOEL BARRETTCORROWER BALLINA CO MAYOEEXTENSION OF DURATION OF P08/303 TO CONSTRUCT DWELLING HOUSE AND SEPTIC TANK AND ALL ANCILLARY SITE WORKS
094340Nov 19 2014Jan 22 2015JIM AND ANN COXCAPNAGOWER CLARE ISLAND CO. MAYOEEXTENSION OF DURATION OF P09/434 TO CONSTRUCT A HOSTEL, LODGE, MARINE ACTIVITIES CENTRE AND REFERENCE LIBRARY, WITH PUBLIC BAR AND RESTAURANT, EFFLUENT TREATMENT SYSTEM AND ALL ANCILLARY SITE WORKS
14596Nov 18 2014Jan 21 2015AIDEN DOHERTY & LAURA EGANPULLATHOMAS BALLINA PCONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE AND ASSOCIATED WORK
0819850Nov 18 2014Jan 21 2015GORETTI PEYTONROSSERK BALLINA CO. MAYOEEXTENSION OF DURATION OF P08/1985 TO CONSTRUCT A NEW DWELLING HOUSE, SEPTIC TANK, PERCOLATION AREA AND GARAGE
14591Nov 17 2014Jan 20 2015MARIE & ALAN RONANKILLERNAN KILMAINE PCONSTRUCT SINGLE STOREY DWELLING HOUSE, GARAGE, SEPTIC TANK AND ALL ANCILLARY SITEWORKS
14595Nov 17 2014Jan 20 2015MARK & MARY ROWLANDAILLEMORE LOUISBURGH PCONSTRUCT DWELLING HOUSE, CAR PORT/STORE, PROPRIETARY EFFLUENT TREATMENT SYSTEM AND ALL ANCILLARY SITEWORKS AND SERVICES
0815570Nov 17 2014Jan 20 2015TONY HEALYCARROWNMORE (E.D CARROWNMORE) BALLINAEEXTENSION OF DURATION OF P08/1557 TO CONVERT EXISTING BUILDING TO 3 NO. SELF CATERING DWELLINGS, RETAIN EXISTING SELF CATERING DWELLING AND TO UP GRADE EXISTING SEPTIC TANK
14588Nov 14 2014Jan 17 2015MOMME REIBISCHDRUMSCOBA ATTYMASS BALLINAPCONSTRUCT EXTENSION TO EXISTING SINGLE STOREY COTTAGE, DEMOLISHING EXISTING EXTENSION TO THE REAR OF PROPERTY
14592Nov 14 2014Jan 17 2015ANTHONY LYONS & KAREN MORANKILMACRADE BREAFFY CASTLEBARPCONSTRUCT DWELLINGHOUSE WITH SEPTIC TANK TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES
097460Nov 14 2014Jan 17 2015RACHEL & JEIHAD MANSOURDOONCASTLE WESTPORT CO. MAYOEEXTENSION OF DURATION OF P09/746 TO CONSTRUCT DWELLING HOUSE, GARAGE, PROPRIETARY EFFLUENT TREATMENT UNIT, SEPTIC TANK AND PERCOLATION AREA
0817280Nov 14 2014Jan 17 2015PATRICK LYNNRATHBAL KNOCKANILLAUN BALLINAEEXTENSION OF DURATION OF P08/1728 TO CONSTRUCT DWELLING HOUSE, SEPTIC TANK, PROPRIETARY EFFLUENT UNIT AND PERCOLATION AREA
14586Nov 13 2014Jan 16 2015JAMES DUIGNAN1 ROCKWELL BALLINA RRETENTION OF EXISTING DOMESTIC GARAGE, TOGETHER WITH ALL ASSOCIATED SITE WORKS.
14587Nov 13 2014Jan 16 2015TOMAS JENNINGSLISSANISKY BALLINROBE PCONSTRUCT DWELLINGHOUSE WITH GARAGE AND EFFLUENT TREATMENT UNIT ON SITE TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES
14593Nov 13 2014Jan 16 2015Aileen Burke and Anthony HollandCorlummin Foxford Co. MayoPThe construction of a dwelling house, on-site waste water treatment system and new site entrance together with ancillary site development works
14594Nov 13 2014Jan 16 2015SHANE GILLDERRYGORMAN WESTPORT PCONSTRUCT DWELLING HOUSE AND DOMESTIC GARAGE WITH PROPRIETARY EFFLUENT TREATMENT SYSTEM TOGETHER WITH ASSOCIATED SITE WORKS
14585Nov 12 2014Jan 15 2015RENATA FREICURRAMORE BALLINROBER PCONSTRUCT DOMESTIC GARAGE/STORE, AND ALL ANCILLARY SITE WORKS
14590Nov 12 2014Jan 15 2015PETER & KATHLEEN MCMANUSRATHREEDAUN BONNICONLON BALLINARRETAIN DWELLING HOUSE, DOMESTIC GARAGE AND SEPTIC TANK
14589Nov 11 2014Jan 14 2015CHARLENE & PETER THOMPSON65 LECKNEEN VILLAGE TURLOUGH CASTLEBARPCONSTRUCT AN EXTENSION TO THE REAR AND SIDE OF THE EXISTING DWELLING TOGETHER AND A ROOFED AREA ON THE SIDE ELEVATION AS WELL AS AN ATTIC CONVERSION AND ALL ASSOCIATED SITE WORKS
08137210Nov 11 2014Jan 14 2015HARRY CANNING,BRIDGE STREET, CASTLEBAR, CO. MAYOEEXTENSION OF DURATION OF P08/913721 FOR DEMOLITION OF EXISTING BUILDINGS TO SIDE AND REAR, CONSTRUCTION OF BASEMENT LEVEL, 5 NO. RETAIL UNITS, 4 NO. APARTMENTS, RENOVATIONS AND ALTERATIONS TO EXISTING PUBLIC HOUSE, CONNECTION TO PUBLIC FOUL SEWER AND ALL ANCILLARY SITE SERVICES
14576Nov 10 2014Jan 13 2015Patrick GeogheganTallagh (ED Belmullet) Tallagh BelmulletPConstruction of a detached dwelling house, domestic garage, proprietary treatment system and all associated works at the above address
14582Nov 10 2014Jan 13 2015COLM MULDOONCARROWBEG WESTPORT RRETAIN A PORCH AND A REAR EXTENSION
14583Nov 10 2014Jan 13 2015M. GILVARRY & S. KELLYKILBREE LOWER SHEEAUNE WESTPORTPCONSTRUCTION OF EXTENSION AND ALTERATION TO EXISTING DWELLING HOUSE AND THE CONSTRUCTION OF ALTERNATIVE ACCESS ROAD TOGETHER WITH ASSOCIATED SITE WORKS
14584Nov 10 2014Jan 13 2015C MCGANN & J. SCAHILL4 THE OLD MILL JAMES STREET WESTPORTPCHANGE OF USE FROM AN OFFICE TO A RESIDENTIAL APARTMENT
14573Nov 7 2014Jan 10 2015NEPHIN WHISKEY CO. LTD.LAHARDAUN BALLINA PDEMOLITION OF 2 NO. SINGLE STOREY SHOP UNITS, TOTAL AREA 61SQM, DEMOLITION OF SINGLE STOREY STORE, AREA 50SQM, DEMOLITION OF STORAGE SHED, AREA 176SQM, CONSTRUCTION OF SINGLE STOREY VISITOR CENTRE WITH USE AS A SHOP, INCLUDING RECEPTION AREA, 6.4M HIGH, AREA 65SQM, CHANGE OF USE OF 2 STOREY DWELLING TO USE AS A STAFF AMENITY BUILDING WITH CANTEEN, OFFICE AND TOILETS AND INCLUDING ALTERATIONS TO WINDOWS AND DOORS, 7.4M HIGH, AREA 79SQM, CHANGE OF USE OF AND RESTORATION OF 2 STOREY STONE GRANARY TO GENERAL PURPOSE BUILDING FOR USES ANCILLARY TO THE DISTILLERY, WITH ALTERATIONS TO ELEVATIONS, 6.9M HIGH, AREA 52SQM, CONSTRUCTION OF 2 STOREY BUILDING WITH COOPERAGE AT GROUND FLOOR AND PROCESS LABORATORY AT FIRST FLOOR AND LINKED TO GENERAL PURPOSE BUILDING, 7.1M HIGH, TOTAL AREA 110SQM WITH STAIRS AND RAMP STRUCTURE FOR FIRST FLOOR LABORATORY ACCESS, CONSTRUCTION OF SINGLE STOREY BUILDING 6.2M HGH AREA 380SQM, COMPRISING BONDED WAREHOUSE AREA 190SQM AND MALTING HOUSE, AREA 190SQM. CHANGE O
14581Nov 7 2014Jan 10 2015SEAN HEALYKILMOREMOY BALLINA RRETENTION OF EXISTING DWELLING HOUSE INCLUDING BOILER HOUSE AND ALL ANCILLARY SITE WORKS AND SERVICES
14579Nov 6 2014Jan 9 2015TIM HASTINGSTHE FAIRGREEN WESTPORT PALTERATIONS TO EXISTING COMMERCIAL PREMISES TO FACILITATE ITS RENOVATION, INCLUSIVE OF ALTERATIONS TO THE SHOP FRONT/FACADE, ELEVATIONS, ALTERATIONS TO THE FORECOURT, INCLUSIVE OF WORKS TO FACILITATE ACCESS FOR PERSONS WITH DISABILITIES, TOGETHER WITH ALL ANCILLARY SITEWORKS AND SERVICES
14580Nov 6 2014Jan 9 2015MARTIN GARDINERKILBRIDE BALLYCASTLE PCONSTRUCT NEW BUNGALOW STYLE DWELLING HOUSE, DOMESTIC GARAGE, PROPRIETARY EFFLUENT TREATMENT SYSTEM AND PERCOLATOIN AREA, TOGETHER WITH ALL ASSOCIATED SITE WORKS
14568Nov 5 2014Dec 2 2014 CROSSMOLINA SHOW COMMITTEEBALLINAMUCK CROSSMOLINA PSECTION 5: CONSTRUCT A STORAGE SHED TO HOUSE SHOW JUMPS, FENCING AND ASSOCIATED EQUIPMENT
14571Nov 5 2014Jan 8 2015MICHAEL & MARY HERATYDOON WESTPORT PRENOVATE AND EXTEND EXISTING DWELLING HOUSE ALONG WITH UPGRADING EXISTING EFFLUENT TREATMENT SYSTEM TOGETHER WITH ANCILLARY SITE WORKS.
14572Nov 5 2014Jan 8 2015MICHAEL KEOGHCAHER LOUISBURGH PADD PORCH TO EXISTING DWELLING HOUSE
14574Nov 5 2014Jan 8 2015SHER RAFIQUESHERWOOD CRESCENT CLARE ROAD BALLYHAUNISPCONSTRUCT DWELLING HOUSE WITH CONNECTION TO EXISTING PUBLIC SERVICES WITH ASSCOIATED SITE SERVICES
14578Nov 5 2014Jan 8 2015DAVID & LINDA McGRANECARROWMORE LOUISBURGH PCONSTRUCTION OF EXTENSION AND ALTERATION TO EXISTING DWELLING HOUSE TOGETHER WITH ASSOCIATED SITE WORKS
0818550Nov 5 2014Jan 8 2015 SEAMUS DOLAN AND JOHN WALDRONCIRCULAR ROAD REAR OF AIDEN STREET KILTAMAGHEEXTENSION OF DURATION OF P08/1855 TO CONSTRUCT 5 NO. TOWNHOUSES AND 6 NO. APARTMENTS ARRANGED IN 3 BLOCKS, ACCESS ROAD WITH FOOTPATHS, PROVISION FOR OFF STREET CAR PARKING LANDSCAPING THROUGHOUT AND CONNECTION TO PUBLIC SEWER NETWORK AND WATERMAINS TOGETHER WITH ALL ANCILLARY SITE WORKS
14577Nov 4 2014Jan 7 2015FRANCIS R McALONANPOLLANOUGHTY DRUMMIN WESTPORTPPARTIAL DEMOLITION OF EXISTING HOUSE AND RECONSTRUCTION OF SAME
0988000Nov 4 2014Jan 7 2015GERARD & BRIDGET MORANKILDUN MORE KILMAINE CO. MAYOEEXTENSION OF DURATION OF P09/880 TO RELOCATE THE DWELLING HOUSE AND GARAGE ON THE SITE AND TO INSTALL THE PREVIOUSLY APPROVED EFFLUENT TREATMENT SYSTEM AND FOR PERMISSION FOR REVISED SITE BOUNDARIES, PREVIOUS PLANNING REF: P07/3352
14566Nov 3 2014Jan 6 2015RICHARD FINNERTYCARTRONBOWER BALLINTUBBER CLAREMORRISPCONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK AND PERCOLATION AREA AND ALL ANCILLARY WORKS
14569Nov 3 2014Jan 6 2015PATRICK SWEENEY & SON LTD.ACHILL SOUND ACHILL PFLOOD PROTECTION WORKS TO EXISTING SUPERMARKET AND BUILDERS PROVIDERS TO INCLUDE, NEW 1.10M HIGH REINFORCED CONCRETE WALL CONSTRUCTED ON EXISTING CONCRETE UPSTAND TO PROTECT AGAINST TIDAL FLOODING. INSTALL FLOOD RESISTANT GATE AT TOP OF SLIPWAY TO PROTECT AGAINST TIDAL FLOODING AT TIME OF MAXIMUM FLOOD RISK. INSTALLING TIDAL FLAPS TO EXISTING DRAINS AND REPAIRING EXISTING WALLS
096290Nov 3 2014Jan 6 2015KIERAN HUGHESCARRICK CALLOW FOXFORDEEXTENSION OF DURATION OF P09/629 FOR DEMOLITION OF EXISTING SUB STANDARD HOUSE AND REPLACEMENT WITH NEW STOREY AND HALF DWELLING HOUSE WITH DETACHED DOMESTIC GARAGE, SEPTIC TANK AND PERCOLATION AREAS AND ALL OTHER ANCILLARY SITE WORKS AND SERVICES
14564Oct 31 2014Jan 3 2015MARTIN JOE GARVEYBALLINDINE EAST BALLINDINE RRETAIN EXTENSION TO DWELLING HOUSE (FORMERLY A DOMESTIC GARAGE)
14565Oct 31 2014Jan 3 2015MCDERMOTT'S HOUSE FURNISHERS LTD.16 SPENCER STREET CASTLEBAR PALTERATIONS TO FRONT FACADE. THE BUILDING ON WHICH THESE WORKS ARE TO TAKE PLACE IS A PROTECTED STRUCTURE
14567Oct 31 2014Jan 1 1900IDA IRELANDABBEYHALFQUARTER BUNREE ROAD BALLINAPCONSTRUCTION OF SECURITY FENCING
14570Oct 31 2014Jan 3 2015KILLALA COMMUNITY WINDFARM LTD.TAWNAGHMORE LOWER KILLALA PRELOCATE AND REVISE ESB SINGLE STOREY SUBSTATION WITH AN ENCLOSED ELECTRICAL EQUIPMENT COMPOUND, 2 NO. 17M HIGH LIGHTNING MONOPOLES, 1 NO. 18M HIGH SCADA TELECOMS POLE AND ASSOCIATED SITE WORKS
0818920Oct 31 2014Jan 3 2015 MARK McDONNELL AND BERMITA HUGHESSHANWAR FOXFORD CO. MAYOEEXTENSION OF DURATION OF P08/1892 TO CONSTRUCT A SINGLE DWELLING HOUSE TOGETHER WITH SEPTIC TANK, PERCOLATION AREA AND ANCILLARY SITE WORKS
14563Oct 30 2014Jan 2 2015CATHERINE & FERGAL BOYLEROOGHAUN CARNACON CLAREMORRISPCONSTRUCT DWELLING HOUSE, SEPTIC TANK, PROPRIETARY WASTEWATER TREATMENT UNIT AND ALL ASSOCIATED SITEWORKS AND SERVICES
14561Oct 29 2014Dec 23 2014STEPHEN BRADY & MELISSA KEANELISCAT BALLYHAUNIS PCONSTRUCT DWELLING HOUSE, GARAGE AND SEPTIC TANK/PROPRIETARY EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES
14575Oct 29 2014Jan 1 1900JAN STUHLMACHERTAWNYKINAFFE ROSS CASTLEBARPDEMOLITION OF EXISTING DWELLING.
14557Oct 28 2014Dec 22 2014STEPHEN NALLENAUGHALASHEEN BELMULLET PCONSTRUCT 55SQM DOMESTIC SHED TOGETHER WITH ALL ANCILLARY SITE WORKS
14558Oct 28 2014Dec 22 2014JOHN & ANNE GANNONBALLYNABREHON SOUTH CLAREMORRIS PREPLACEMENT OF EXISTING DWELLING HOUSE ON FARMSTEAD WITH NEW DWELLING HOUSE (CONSISTING OF DEMOLITION OF EXISTING DWELLING HOUSE AND CONSTRUCTION OF NEW DWELLING HOUSE, NEW GARAGE, NEW WASTEWATER TREATMENT SYSTEM AND ASSOCIATED SITE WORKS AND SERVICES)
14559Oct 28 2014Dec 22 2014CATHAL & PATRICIA CAWLEYGORTEENS DALGAN ROAD SHRULEPCONSTRUCT DWELLING HOUSE WITH SEPARATE GARAGE, WASTEWATER TREATMENT SYSTEM AND SOIL POLISHING FILTER TOGETHER WITH ALL ANCILLARY SITE DEVELOPMENT WORKS
14560Oct 28 2014Dec 22 2014 BUS EIREANNHUMBERT STREET BALLINA PREMOVE A SECTION OF EXISTING PUBLIC CAR-PARK BOUNDARY WALL, EXTEND CONCRETE APRON TO REAR OF EXISTING PUBLIC FOOTPATH FOR THE INSTALLATION OF A 5.3M X 1.9M X 2.5M HIGH STAINLESS STEEL AND GLASS BUS SHELTER WITH 2 NO. INTERNALLY ILLUMINATED ADVERTISING PANELS EACH OF 2SQM AREA AT EXISTING BUS STOP
14562Oct 28 2014Dec 22 2014NOEL FEEHAN & RUTH GIBBONSMACE SOUTH AGHAGOWER WESTPORTPCONSTRUCT DWELLING HOUSE AND DOMESTIC GARAGE, THE INSTALLATION OF A SEPTIC TANK AND WASTE WATER IRRIGATION SYSTEM TOGETHER WITH ANCILLARY SITE WORKS
14552Oct 24 2014Dec 18 2014GEORGE REIDYLOWER CHAPEL STREET CASTLEBAR PCONSTRUCT 2 NO. DWELLINGHOUSES, CONNECTION TO PUBLIC FOUL SEWER AND ALL ANCILLARY SITE SERVICES
14553Oct 24 2014Dec 18 2014SEAMUS MALONEYCLOONLYON SONNAGH CHARLESTOWNRRETENTION PERMISSION FOR DEVELOPMENT CONSISTING OF PERCOLATION AREA P13/368 REFERS, STORAGE SHED AND GREENHOUSE/POLY TUNNEL
14554Oct 24 2014Dec 18 2014EMMA KELLY & PHILIP DUNLEAVYCAHERAVOOSTIA KILMAINE PCONSTRUCT DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT, PERCOLATION AREA AND DOMESTIC GARAGE ALONG WITH ALL ASSOCIATED SERVICES
14555Oct 24 2014Dec 18 2014DAVID HOLMESCLOONDAFF GLENHEST NEWPORTPPERMISSION TO FILL LANDS WITH INERT SOLID FOR THE PURPOSE OF LAND RECLAMATION, TOGETHER WITH ASSOCIATED SITE WORKS
14556Oct 24 2014Dec 18 2014BURRISHOOLE COMMUNITY PARTNERSHIPBARRACKHILL BURRISHOOLE NEWPORTPCONSTRUCT A NEW MULTI-PURPOSE COMMUNITY CENTRE, FOR EDUCATIONAL, LEISURE AND SPORTS PURPOSES, A SPORTS PLAYING FIELD, A WALKING ROUTE AND BUS AND CAR PARKING FACILITIES, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES
0821020Oct 24 2014Dec 18 2014 ARKNITE LIMITEDCLARE (KILBEG) CLAREMORRIS CO. MAYOEEXTENSION OF DURATION OF P08/2102 FOR THE CONSTRUCTION OF A SINGLE STOREY RETAIL DEVELOPMENT (7,075 SQ M GROSS (WITH A MAXIMUM HEIGHT OF 8.8 M)) COMPRISING 1 NO. ANCHOR STORE (5,487 SQ M GROSS), 7 NO. RETAIL UNITS (RANGING FROM 93 TO 268 SQ M GROSS), AND ANCILLARY CIRCULATION SPACE (650 SQ M). THE DEVELOPMENT WILL ALSO INCLUDE THE PROVISION OF 283 NO. SURFACE CAR-PARKING SPACES (ANCILLARY TO THE RETAIL USE); RECYCLING AREAS; PLANT; SERVICE YARDS; LANDSCAPING AND BOUNDARY TREATMENTS; LIGHTING; INTERNAL ROADS; BICYCLE PARKING; PEDESTRIAN WALKWAYS (INCLUDING A NEW PEDESTRIAN LINK TO BALLYHAUNIS ROAD); VEHICULAR ACCESS POINTS; SIGNAGE; CHANGES IN LEVEL AND ALL ASSOCIATED SITE DEVELOPMENT WORKS ABOVE AND BELOW GROUND. VEHICULAR ACCESS TO THE SITE WILL BE FROM THE N60
14547Oct 23 2014Dec 17 2014MARTIN & CATHRIONA O'DONNELLTONREGEE EAST WESTPORT PCONSTRUCT DWELLING HOUSE, GARAGE, PACKAGED WASTEWATER TREATMENT SYSTEM, POLISHING FILTER AND UPGRADE EXISTING VEHICULAR ACCESS ROAD
14548Oct 23 2014Dec 17 2014MICHAEL & GERALDINE KAVANAGHROOSKY FOXFORD PCONSTRUCT HORSE STABLES AND ALL ASSOCIATED SITE WORKS INCLUDING DUNGSTEAD
14549Oct 23 2014Dec 17 2014Brendan BlewittRinagry Knockmore BallinaPFull Planning Permission for the construction of proposed extensions to existing dwelling house on all elevations, together with all ancillary development
14550Oct 23 2014Dec 17 2014CATHY DONALADSONCARHA CASTLEBAR RRETENTION FOR ALTERATIONS MADE TO EXISTING AGRICULTURAL BUILDING, RETENTION FOR SEPTIC TANK AND PERCOLATION AREA. PERMISSION TO DEMOLISH EXISTING DERELICT BUILDING AND CONSTRUCT NEW PRIVATE STABLES AND ALL ASSOCIATED SERVICES
14551Oct 23 2014Dec 17 2014RIONA PRENDERGASTBALLYDAVOCK BELCARRA CASTLEBARPCHANGE OF HOUSE AND DOMESTIC GARAGE TYPE FROM THAT GRANTED UNDER P14/210 ALONG WITH ALL ASSOCIATED SITE WORKS
098750Oct 22 2014Dec 16 2014CATHERINE TOLANBREANDRUM OR WINDSOR (TURLOUGH) CASTLEBAREEXTENSION OF DURATION OF P09/875 TO RETAIN AND COMPLETE HOUSE GRANTED ON FOOT OF PLANNING PERMISSION P09/472 AND P03/2926
099150Oct 22 2014Dec 16 2014OLIVER MORANBALLINVOASH BREAFFY CASTLEBAREEXTENSION OF DURATION OF P09/915 TO CONSTRUCT DWELLING HOUSE, EFFLUENT TREATMENT UNIT AND PERCOLATION AREA
0730920Oct 22 2014Dec 16 2014GERARD COFFEYMAIN STREET KILKELLY CO MAYOEEXTENSION OF DURATION OF P07/3092 FOR 1. CONSTRUCT EXTENSION TO EXISTING CHEMIST SHOP AND STORAGE AREA, ALTER LAYOUT OF CHEMIST SHOP AND OPTICIANS OUTLET AND CONSTRUCT TREATMENT ROOMS, CARRY OUT NECESSARY STRUCTURAL ALTERATIONS AND CHANGES TO ELEVATIONS INCLUDING RELOCATION AND ALTERATION OF EXISTING ARCHWAY FACING ONTO PUBLIC STREET 2. CONSTRUCT 2 STOREY OFFICE BUILDING WITH STAFF FACILITIES AND CONSTRUCT 3 NO. COMMERCIAL UNITS WITH ASSOCIATED STORAGE, STAFF AND YARD FACILITIES TOGETHER WITH 3 NO. APARTMENTS AT FIRST FLOOR LEVEL AND ALL ANCILLARY SITE WORKS AND SERVICES FOR ENTIRE DEVELOPMENT WITH PARKING AND SITE ACCESS AND CONNECTIONS TO PUBLIC SERVICES
14543Oct 21 2014Dec 15 2014LIAM & MARY MORRISEYKNOCKSAXON BALLA PRENOVATE AND EXTEND EXISTNG COTTAGE, INSTALL AN EFFLUENT TREATMENT UNIT WITH PERCOLATION AREA TOGETHER WITH ALL ASSOCIATED SITE WORKS P07/3245 REFERS
14544Oct 21 2014Dec 15 2014SEAMUS FADDENBALLYHEANE PCHANGE OF HOUSE TYPE AND CHANGE OF SITE BOUNDARY FROM THAT GRANTED UNDER P11/281
14545Oct 21 2014Dec 15 2014ENDA & MARY BERMINGHAMTOMBOHOLLA CHARLESTOWN RRETENTION OF EXISTING DOMESTIC STORAGE SHED/GARAGE
14542Oct 20 2014Dec 14 2014CASTLEBAR CREDIT UNIONMARKET SQUARE CASTLEBAR PRENOVATION AND EXTENSION OF EXISTING CREDIT UNION BUILDING, COMPRISING CONSTRUCTION OF NEW 638SQM EXTENSION OVER TWO FLOORS, RENOVATION OF EXISTING BUILDING, ALTERATIONS TO EXISTING FACADES INCLUDING REMOVAL OF EXISTING TIMBER SHOP FRONT SIGNAGE, RELOCATION OF EXISTING ATM, DEMOLITION OF EXISTING BOUNDARY WALL AND RAILINGS, ALTERATIONS TO EXISTING PAVING, FOOTPATHS AND BOUNDARY TREATMENTS, AND ALL ASSOCIATED SITE WORKS, DRAINAGE, LIGHTING AND SERVICES CONNECTIONS
097900Oct 20 2014Dec 14 2014LIAM MCDONALDBALLYSHINGADAUN THE NEALE CO. MAYOEEXTENSION OF DURATION OF P09/790 TO CONSTRUCT DWELLING HOUSE, PROPRIETARY TREATMENT SYSTEM, PERCOLATION AREA AND DOMESTIC GARAGE, ALONG WITH ALL ASSOCIATED SERVICES
14537Oct 17 2014Nov 13 2014VINCENT LYNOTTCASTLETOWN CARRAMORE LACKEN BALLINAPSECTION 5: TO RELOCATE STONE IN ORDER TO PREVENT EROSION
14538Oct 17 2014Dec 11 2014CATHAL & SARAH MCLAUGHLINTAWNAGH BEG STRAIDE PCONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK AND PERCOLATION AREA ALONG WITH ANCILLARY SITE WORKS
14539Oct 17 2014Dec 11 2014MICHAEL KEAVNEYLECKNEEN TURLOUGH PCHANGE OF USE OF COMMERCIAL GROUND FLOOR UNIT PREVIOUSLY GRANTED UNDER P04/3018 TO RESTAURANT /TAKEAWAY AND TO INCLUDE ALL NECESSARY ANCILLARY SITE WORKS
14540Oct 17 2014Dec 11 2014PAT COLEMANFARMHILL CLAREMORRIS PCONSTRUCTION OF AN EXTENSION TO THE EXISTING MILKING PARLOUR AND THE PROVISION OF A NEW DAIRY TO SERVICE THE NEW EXTENDED MILKING PARLOUR
14541Oct 17 2014Dec 11 2014MARTIN & BREEGE MCGLOINMARKET SQUARE MORROUGH BERNARD ROAD FOXFORDRRETENTION AND COMPLETION OF THE FRONT ELEVATION OF THE EXISTING BUILDING, MODIFYING ELEVATIONS PREVIOUSLY PERMITTED UNDER P06/586 & P10/154
106000Oct 17 2014Dec 11 2014MARTIN HEALYCORNER OF NEALE RD & BOWG BALLINROBE DEMESNE (CLONB EEXTENSION OF DURATION OF P10/60 FOR DEMOLITION OF EXISTING DWELLING HOUSE AND THE CONSTRUCTION OF A COMMERCIAL BUILDING CONSISTING OF GROUND FLOOR RETAIL UNIT(S) AND FIRST FLOOR OFFICES
097890Oct 17 2014Dec 11 2014JONATHAN & GILLIAN MONAHANMALTPOOL CLAREMORRIS CO. MAYOEEXTENSION OF DURATIO OF P09/789 FOR CONSTRUCTION OF A NEW DWELLING HOUSE, GARAGE, SEPTIC TANK AND PERCOLATION AREA
14536Oct 16 2014Dec 10 2014JANET & STEVE O'DONNELLLETTERBROCK LISCARNEY WESTPORTRRETAIN SITE ENTRANCE AND ANCILLARY SITE WORKS AS BUILT P04/1314
097940Oct 16 2014Dec 10 2014MARTIN & MAIREAD Mc ANDREWKNOCKALEGAN HOLLYMOUNT CO MAYOEEXTENSION OF DURATION OF P09/794 FOR DEMOLITION OF THE EXISTING COTTAGE AND THE CONSTRUCTION OF A NEW DWELLING HOUSE, MECHANICAL AERATION UNIT AND SOIL POLISHING FILTER
099610Oct 16 2014Dec 10 2014MARTIN AND BREEGE MCGLOINMARKET SQUARE/MORROGH BER FOXFORD (IRISHTOWN) CO. MAYOEEXTENSION OF DURATION OF P09/961 TO CHANGE OF USE OF FLOOR SPACE OF EXISTING SHOP FROM GROCERY RETAIL TO OFF LICENCE TOGETHER WITH RELATED WORKS
0930000Oct 16 2014Dec 10 2014 NEALE ROAD FOODS LTD.BALLINROBE DEMESNE (CLONB BALLINROBE CO. MAYOEEXTENSION OF DURATION OF P09/30 TO CONSTRUCT A NEW PRIMARY HEALTHCARE FACILITY. THE DEVELOPMENT WILL INCLUDE A NEW EXIT ONTO THE NEALE ROAD, SURFACE PARKING FOR SIXTY FIVE CARS, LANDSCAPING AND ASSOCIATED SITE WORKS
14535Oct 15 2014Dec 9 2014MARK CULLINEYLISSANISKA BEKAN CLAREMORRISRRETENTION OF HOUSE AND DOMESTIC GARAGE AS COMPLETED ON REVISED SITE BOUNDARIES, INCLUDING ALL ANCILLARY SITE WORKS
095930Oct 15 2014Dec 9 2014MARGARET KELLYBALLYMACHUGH BALLYCASTLE BALLINAEEXTENSION OF DURATION OF P09/5936 TO CONSTRUCT NEW DWELLING HOUSE, SEPTIC TANK, PERCOLATION AREAS, CONNECT TO EXISTING GROUP WATER SCHEME AND TO CARRY OUT ALL ANCILLARY SITE DEVELOPMENT WORKS
14531Oct 14 2014Jan 1 1900BRENDAN BLEWITTCOLLADUSSAUN KNOCKMORE BALLINAPCONSTRUCT PROPOSED EXTENSIONS TO EXISTING DWELLING HOUSE ON ALL ELEVATIONS TOGETHER WITH ALL ANCILLARY DEVELOPMENT
102440Oct 14 2014Dec 8 2014BRENDAN MCNULTY & SUSAN LAMBEBALLINTEMPLE MEELICK SWINFORDEEXTENSION OF DURATION OF P10/244 TO CONSTRUCT DWELLING HOUSE, INSTALLATION OF SEPTIC TANK TREATMENT UNIT AND PERCOLATION AREAS TOGETHER WITH ALL ANCILLARY SITE WORKS
14528Oct 13 2014Dec 7 2014BRIAN DOHERTYNO. 1 CLUAIN PADRAIG CLOONMONAD WESTPORTRRETENTION OF CHANGES TO THE GROUND FLOOR LAYOUT TO INCLUDE A GRANNY FLAT
14529Oct 13 2014Dec 7 2014JOHN HYNESBERTRA ROAD THORNHILL MURRISKPCONSTRUCT DWELLING HOUSE AND DOMESTIC GARAGE WITH A PROPRIETARY EFFLUENT TREATMENT SYSTEM TOGETHER WITH ANCILLARY SITE WORKS
14530Oct 13 2014Dec 7 2014MAUREEN CALL GALLAGHERDOOAGH KEEL WEST ACHILLPCONSTRUCT DWELLING HOUSE WITH CONNECTION TO ALL PUBLIC SERVICES ALONG WITH ALL NECESSARY SITE WORKS AND ANCILLARIES
14533Oct 13 2014Dec 7 2014BELMULLET SUB AQUA CLUBUDURAS INDUSTRIAL ESTATE BELMULLET RRETENTION OF A STORAGE UNIT FOR HOUSING SUB AQUA EQUIPMENT TO INCLUDE ALL OTHER ANCILLARY SITE SERVICES AND DEVELOPMENT WORKS
14534Oct 13 2014Dec 7 2014SEAN LANGANBALLISNAHYNY GLENCORRIB SHRULERRETENTION OF BASEMENT GARAGE/STORE FLOOR LEVEL, ALTERATIONS TO ELEVATIONS AND REVISED SITE BOUNDARY P99/2747 REFERS
0911530Oct 13 2014Dec 7 2014 MARDAM CONSTRUCTIONRATHSCANLAN SWINFORD EEXTENSION OF DURATION OF P09/1153 FOR CHANGE OF PLANNING PERMISSION ON SITE NO.'S 27 AND 28 FROM A PAIR OF SEMI DETACHED 3 BED HOUSES TO A FIVE (5) BED DETACHED HOUSE AND ON SITE NO.'S 35 AND 36 FROM A PAIR OF SEMI-DETACHED, TWO (2) BED HOUSES TO A FIVE (5) BED DETACHED HOUSE. THE ORIGINAL LAYOUT AND UNITS WERE PREVIOUSLY GRANTED PLANNING PERMISSION UNDER PLANNING REFERENCE NO. P06/1372. THE PROPOSED DETACHED UNITS ARE TO BE CONNECTED TO THE EXISTING SITE SERVICES AS PREVIOUSLY GRANTED.
0818500Oct 13 2014Dec 7 2014JAMES DONNELLY & DEBORAH FEELEYPOLLRONAHAN MORE KILTAMAGH CO MAYOEEXTENSION OF DURATION OF P08/1850 TO CONSTRUCT NEW DWELLING HOUSE, GARAGE, SEPTIC TANK, PERCOLATION AREAS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS